Building contract / Bert Bielefeld
Material type:
- 9783035616026
- 690.068 BIE-B
Item type | Current library | Collection | Shelving location | Call number | Copy number | Status | Date due | Barcode | Item holds | |
---|---|---|---|---|---|---|---|---|---|---|
![]() |
BITS Pilani Hyderabad | 690 | General Stack (For lending) | 690.068 BIE-B (Browse shelf(Opens below)) | EU : 22.00 | Available | 47700 |
Browsing BITS Pilani Hyderabad shelves, Shelving location: General Stack (For lending), Collection: 690 Close shelf browser (Hides shelf browser)
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
||
690.0285 KUM-B Practical guide to adopting BIM in construction projects / | 690.0286 SMI-G Green nanotechnology : solutions for sustainability and energy in the built environment / | 690.068 BEC-P Project control / | 690.068 BIE-B Building contract / | 690.068 CIV-A Construction operations manual of policies and procedures / | 690.068 FEW-P Construction project management : an integrated approach / | 690.068 FEW-P Construction project management : an integrated approach / |
Once the design has been completed, the architects prepare the tender documents for the contractors, and provide support during the tender procedure. For the purpose of commissioning various building works it is necessary to set up building contracts which contain standard content as well as very individual provisions.
The building contract and its extensive drawings and specifications are the basis for the building work; they must be understood by the supervising architect and implemented to create the building. The complexity and diversity of building contracts is increased by the fact that there is hardly a building contract that does not have to be modified after it has been signed.
Basics Building Contract offers the typical structures and explanations, as well as the tools for creating project-specific contracts and understanding the inherent complexity.
There are no comments on this title.